浴室情欲2韩国中文字幕_国产精品高清一区二区三区_国产精品乱码在线观看_麻豆高清免费国产一区

您好!歡迎訪問蚌埠三合電子科技有限公司網站!
全國服(fu)務咨詢熱(re)線:

當前位置:首頁 > 技術文章 > 外貿地磅參數配置及安裝步驟

外貿地磅參數配置及安裝步驟

更新時間:2016-08-21      點擊次數:2758

一、技術參(can)數:

1、操作(zuo)工(gong)況(kuang)及技術條件

1.1 環(huan)境氣溫:-30℃~+65℃

1.2 稱重對(dui)象:車(che)載(zai)特資

1.3 秤體 3X14M

額定稱重:50T\允(yun)許軸(zhou)載30T

精度等(deng):III

刻度20kg

臺(tai)面(mian)尺寸: 3m×14m   秤臺(tai)面(mian)板厚(hou)度:12mm

安(an)全過載:150%F·S

承重臺超載:200%

結構(gou)形式(稱體(ti)):U型鋼(gang),箱式密封結構(gou),模塊4節(jie)臺(tai)面式,臺(tai)面板厚(hou)度10MM,秤臺(tai)表里刷二道防(fang)銹底漆,表面噴灰(hui)色面漆。

穩定時間:5秒

1.4 防爆傳感器 SQC-30T(橋式)

額(e)定荷(he)載30T;精度:0.02%(即0.02)

安全過載:150%F.S,極限過載:300%F.S

數(shu)量及選型(xing):1臺

防護(hu)等:IP67

1.5 稱重信(xin)號處理系(xi)統:

1.6 此(ci)套配置為我公司結合自向十(shi)年電子衡器制造經驗和中外先進半導體技術的結晶。

1)重量顯(xian)(xian)示:冷色數碼(ma)顯(xian)(xian)示與超大LED顯(xian)(xian)示,(附(fu)加(jia)配置)即一臺秤有兩處同時顯(xian)(xian)示稱重數據(ju),使用方便(bian)而又(you)有保障。

2)有完整(zheng)的自(zi)檢功能(neng)和強大的稱(cheng)重信息(xi)管理(li)功能(neng)。

3)非線性+0.01%OF FULL SCALL

4)靈敏度(du)0.8ч V/D溫度(du)系數  +0.0005%/℃

5)電腦(nao)鍵(jian)盤式操作鍵(jian)

6)電(dian)源220VAC 50HZ

7)功能(neng):

◆*的皮重功能:

手動皮重資料(liao)輸(shu)入

線上皮重資(zi)料查詢

200筆皮重資(zi)料記憶

◆萬年歷(時鐘(zhong)功能):

可顯示年/月(yue)/日、時/分(fen)/秒,自動(dong)閏年、閏月(yue)

精(jing)度:+ 5s/24h,不受斷電影響

◆顯示(shi):

稱(cheng)重儀表顯(xian)示:七(qi)位冷(leng)色數碼管顯(xian)示、狀態符指示(零(ling)點(dian)、不(bu)穩定(ding)偵(zhen)測、毛重、凈重、皮重輸(shu)入、電源(yuan)) 

資料處理器顯示(shi):背光彩(cai)色型液晶顯示(shi)屏(ping)、中文畫面顯示(shi)

◆大屏幕顯示和(he)進入電腦(nao)管理的接口設置

◆提供多種(zhong)磅單格式:單張三聯式、非碳復寫式

1.7接線盒:專業穩固型設計(ji),采用柔性橡膠密封、5PPM(百成分之五/℃)溫度系數(shu)

1.8精密電阻、防(fang)水接頭

1.9穩壓電源:SANTAK UPSK500

2、安(an)裝條件:

2.1 秤體(ti)為露天安(an)裝(zhuang),其他按供方要求

2.2 電(dian)壓220VAC (-15%~+10%,50Hz)

1. Check all goods against list, pay attention to the steel-seal letter A1、A2、A3、A4、A5、A6、A7、  A8、A9、A10、A11、A12 on the surface of the scale-bodies, load cells, tools wooden cases and   indicator (See the following figure).Be ready to install   A2 A4 A6 A8 A10 A12   A1 A3 A5 A7 A9 A11

2. Scale-body assembling:   Lift the scale-bodies of corresponding marking with the 28mm shackle and assemble with a crane   (usually 15t), overturn and lie them flat(pad wood under the scale bodies to prevent the paint scaling   off), attention to the marking.the marking of A1、A3 with the marking of A2、A4 of the scale-body, the   marking of A5、A7 with the marking of A6、A8 of the scale-body , the marking of A9、A11 with the   marking of A10、A12 of the scale-body, then tighten the scale-bodies with 96 sets of M20X60   socket head cap bolts with M30 adjustable spanner,M20 socket head cap spanner and φ30x500mm   lever. Each pair of bolts including 2 washer, 1 spring washer and 1 thickening nut. See the following   figure:  

3. Installing load cell  Tighten the M16X45 bolts with the lever. Each pair of bolts is including 1 washer and 1 spring  washer.    (Note: The marking on the load cell and scale-body should be consistent.)   Note:a. Install the load cell directly on the back of the markings A1、A2、A11、A12 of the scale-bodies.   b. Install the load cell on connecting-plate of the scale-bodies markings A3、A4、A7、A8 of the  scale-bodies.

4. Place the scale-body into the completed pit

4.1 Fix up one end of the four steel cable in the same length into the installation hole on the  scale-body which marked A1、A2、A3、A4 using the shackle, the other end of the steel cable should   cover with the crane. Ensure the scale-body in level when lifting. The degree of angle of the steel   cable should not less than 45°.   

4.2 Lift the scale-body above the foundation slowly, put δ25~δ30mm thicken wood plate   between the scale-body and the walls of the foundation pit to guarantee the scale-body into center   place. Then put the load cell's steel ball and base-plate of ball-bowl on the foundation plate. Position   scale-body into the foundation .See the following figure:   Thicken Wood  

4.3 Install the second-section scale-body which marked A5、A6、A7、A8, ensure the marking   A5、A6 of the second-section scale-body should be corresponding with the marking A3、A4 of   the first-section scale-body. Place this scale-body into foundation pit slowly and attention to the   position of the joint. make sure the joint hole of joint should be corresponding with the connect   forelock of the first section scale-body. attention to adjusting the clearance about 5~6mm   between the two sections of scale-bodies. The clearance around the scale-body is roundly the   same. See the following figure:

4.4 Lift and install the third-section scale-body(which marked A9、A10、A11、A12),ensure the   marking A9、A 10 of the third-section scale-body should be corresponding with the marking A7、A8   of the second-section scale-body. The installation step the same as the first and second section   scale-body.

5. Adjust the scale-body after placing is finished.

5.1. Check the eight steel-ball of load cell, If the steel-ball can be rotated, jack the scale-body up   in that position with the jack and put the level-adjusting plate under the installation plate for load cell   to make sure the steel-ball can't be rotated.   5.2. Adjust the M30x85 common limit bolts of the scale-body. (Rotate the bolt, it is better that there   is 5mm between the front-end of the bolt and the surface of scale-body, then rotate the nut.) In order   to avoid weighing accurate is not good from big rocking when the truck drives on the scale.

6. Pass out the signal cable from the passing-tube. Tie up the signal cable on the iron wire in the  passing-tube when passing. Then pull the iron wire to achieve the goal of passing. Next join the signal   cable to the junction box. (Attention to the marking on load cell and junction box should be consistent),   then fix up the junction box onto the two side-cover plates.) Then fixup the junction box on the side   cover-plate of the scale-body.

7. Fixup one end of the ground-cable onto the connecting-plate using M16 bolts, and fix up the other  end of the ground-cable onto ball-bowl base under-press using M12 bolts to let the load cell   short-connection, it will protects the load cell from damage by lightning when they are working.   ground-cable  

8. Install the side-cover plate of the load cell: fixup the the cover-plate of load cell on the scale-body  with 24 sets of M10×25 stainless steel common bolts. attention to the marking on the side-cover plate   and the scale-body should be consistent.  

9. Install the bracket: fixup the bracket on the side of the scale-body with the 36 sets of M16×35  common bolts(each pair including 1 washer, 1 spring washer, zinc-galvanizing treatment)  

10. Pass out the signal cable from the PVC tube in foundation and join it into the pounds-room.

11. The installation is finished.

蚌埠三合電子科技有限公司
地址:安徽省蚌埠市蚌山區聚云商務廣場1號樓722室
郵箱:
傳真:86--808
關注我們
歡迎您關注我們的微信公眾號了解更多信息:
歡迎您關注我們的微信公眾號
了解更多信息